Startpoint: r2 (rising edge-triggered flip-flop clocked by clk) Endpoint: r3 (rising edge-triggered flip-flop clocked by clk) Path Group: clk Path Type: max Delay Time Description --------------------------------------------------------- 0.00 0.00 clock clk (rise edge) 0.00 0.00 clock network delay (ideal) 0.00 0.00 ^ r2/CK (DFF_X1) 2.58 2.58 ^ r2/Q (DFF_X1) 2.59 5.17 ^ u1/Z (BUF_X1) 2.77 7.95 ^ u2/ZN (AND2_X1) 0.00 7.95 ^ r3/D (DFF_X1) 7.95 data arrival time 10.00 10.00 clock clk (rise edge) 0.00 10.00 clock network delay (ideal) 0.00 10.00 clock reconvergence pessimism 10.00 ^ r3/CK (DFF_X1) -0.61 9.39 library setup time 9.39 data required time --------------------------------------------------------- 9.39 data required time -7.95 data arrival time --------------------------------------------------------- 1.45 slack (MET)